Energy and Environment

U-PATH

Full title: Understanding and preventing climate-related health risks through mediating pathways

Partners: Lisbon Council (BE), Danish Cancer Society (DK), Aarhus University (DK), Institute for Medical Research and Occupational Health (HR), University of Sevilla (ES), Finnish Institute for Health and Welfare (FI), Azienda Sanitaria Locale ROMA 1 (IT), Karolinska Institutet (SE), Institute for Anthropological Research (HR), Municipality of Split (HR), Municipality of Seville (ES), Institute Ruđer Bošković (HR), Institute of Communication and Computer Systems (GR), Croatian Meteorological and Hydrological Service (HR), Universidade Estadual de Campinas (BR).

Start Date: 01/01/2027 Duration: 48 months 

Horizon Europe

BetterLIFE

Full title: Boosting Energy Transition and Transformation in Empowering Cities and Regions for Clean Heating and Cooling

Partners: Eurac Research (IT) - Coordinator, IEECP (NL), IREES (DE), REVOLVE (BE), Energy Cities (FR), TU Wien (AT), e-think (AT), Municipality of Gabrovo (BG), Codema (IE), ENERGAP (SI), EPU - NTUA (GR), Municipality of Almada (PT)

Start Date: 01/10/2026 Duration: 36 months 

European Commission (CINEA) – LIFE Programme

SKILLSBOOST SEE

Full title: Empowering Southeast Europe’s Construction Sector Workforce for Clean Energy Transition

Partners: EnEffect (BG, Coordinator), PRO-NZEB (RO), MDPWA – Ministry of Development, Public Works and Administration (RO), TEC Cluster (RO), UNIZAG GF – University of Zagreb, Faculty of Civil Engineering (HR), REAN – Regional Energy Agency North (HR), CCTC – Croatian Chamber of Trades and Crafts (HR), CRES (GR), EPU-NTUA (GR), HPHI – Hellenic Passive House Institute (GR), BCC – Bulgarian Construction Chamber (BG), BACIW (BG), NAVET – National Agency for Vocational Education and Training (BG), Interimage (BG)

Start Date: 01/09/2026 Duration: 36 months 

European Commission, LIFE Programme (LIFE-2025-CET, Clean Energy Transition), managed by CINEA

Remanufacturing-X

Full title: Accelerating Europe’s Transition to Digital Circular Manufacturing

Partners: UNINOVA (PT), UPV (ES), UNIVPM (IT), ICCS (GR), UPATRAS (GR), POLIBA (IT), UAEGEAN (GR), IDEA (PT), AITEX (ES), ICE (UK), CESI (IT), CLESGO (DE), PROFACTOR (AT), IVLAB (BE), INM (HU), IDC (IT), EIT Manufacturing West (ES), APHAIA (ES), DIN (DE), PICVISA (ES), LETRA (PT), PAMA (IT), OCEANSCAN (PT), VOLTFACTORY (AT)

International partners: Tokyo University of Technology (JP), National Chengchi University (TW), Aoyama Gakuin University (JP), University of Tokyo (JP), Osaka Institute of Technology (JP).

Start Date: 01/09/2026 Duration: 36 months 

European Commission, Horizon Europe – HORIZON-IA

PACK

Full title: Persistent Awareness system facilitating Customs ChecKs

Partners: General Mechatronics Kft (HU), SZEKELY FAMILY & CO NONPROFIT KORLATOLT FELELOSSEGU TARSASAG (HU), LINKOPINGS UNIVERSITET (SE), EREVNITIKO PANEPISTIMIAKO INSTITOUTO SYSTIMATON EPIKOINONION KAI YPOLOGISTON (GR), INSTITUTE OF ARTIFICIAL INTELLIGENCE PROBLEMS (UA), INSTYTUT INFORMATYKI TEORETYCZNEJ ISTOSOWANEJ POLSKIEJ AKADEMII NAUK (PL), AUTORITATEA VAMALA ROMANA (RO), NEMZETI ADO- ES VAMHIVATAL (HU)

Start Date: 01/10/2025 Duration: 36 months

Horizon Europe

Le Colaz

Full title: Building an Adaptable Future Brick by Brick through a Comprehensive Framework for Circular, Secure, and AI-Optimized Sustainable Construction

Partners: ETHNICON METSOVION POLYTECHNION (NTUA), ENVOLV AI AND TECHNOLOGIES IKE (ENVOLV AI), INSTITUTE OF COMMUNICATION AND COMPUTER SYSTEMS (ICCS), AB INSTITUTE OF ENTREPRENEURSHIP DEVELOPMENT LTD (AB iED), INSTITUTO TECNOLÓGICO DE ARAGÓN (ITA), TECH INSPIRE LTD (TEC), E2ARC ARCHITECTURE RESEARCH FOR CITIES (E2ARC), LULEÅ TEKNISKA UNIVERSITET (LTU), BLUEBLOCKS B.V., CENTRE TECHNIQUE INDUSTRIEL DE LA PLASTURGIE ET DES COMPOSITES (IPC), NORGES TEKNISK-NATURVITENSKAPELIGE UNIVERSITET (NTNU).

Start Date: 01/09/2025 Duration: 42 months

Horizon Europe

ReBoat

Full title: Circular Systemic Solution for Sustainable Tourism in European Islands by Movable Plant on a Boat and Co-Creation with Island Stakeholders

Partners: POLIMI (IT), ICCS(GR), R2M (IT), EDAG (DE), VELTHA (BE), SYXIS (LT), COT (IT), OS (IT), GTI (IT), FT (IT), EPLO (GR), COSMOS SA (GR), IONIAN(GR), AZORES (PT), EOLIAN (IT), 

Start Date: 1/1/2025 Duration: 42 months

European Commission, HORIZON-IA